How to Apply for Solar Subsidy
From the first application to the money in your account, our team runs the lot. Here's exactly how it unfolds.
Leave the Paperwork Entirely to Us
Portal sign-up, document uploads, DHBVN coordination, grant follow-up — the whole lot is handled on your behalf. All you do is hand over a few basic documents and start enjoying near-free solar power.
The Process, Step by Step
A clear look at everything that happens between your first call and the grant reaching your account.
Get in Touch
Drop us a call, a WhatsApp message, or fill the contact form. We talk through what you need, clear up any doubts, and book a site visit.
You do
Ring us or submit the form
We do
Map out your needs and answer every question
Roof Survey & Design
We come to your property, study the roof, factor in shading and direction, and engineer the best-fit solar setup for your home.
You do
Give us access to the rooftop
We do
Run the survey and hand over the design and quote
PM Surya Ghar Filing
We lodge your application on the PM Surya Ghar National Portal (pmsuryaghar.gov.in) and submit every required document.
You do
Share Aadhaar, electricity bill, bank details
We do
Portal sign-up, document uploads, application filing
Installation
Expert fitting of the mounting structure, panels, inverter, safety gear, cabling and all electrical work — typically wrapped up in one to two days.
You do
Be around on the install day
We do
Complete end-to-end installation
Net Metering & Inspection
We liaise with DHBVN for the net meter, grid synchronisation and the DISCOM inspection so your plant is officially cleared.
You do
Nothing — we take care of it
We do
DHBVN coordination, meter fitting, inspection
Grant Disbursement
We file the commissioning report on the National Portal. The subsidy is then transferred straight to your bank account, usually within 30 to 60 days.
You do
Receive the grant in your account
We do
File the commissioning report and follow up to payout
Typical Timeline
| Phase | Duration |
|---|---|
| Consultation and roof survey | 1-3 days |
| Portal filing and approvals | 3-7 days |
| Installation | 1-2 days |
| Net metering and DHBVN inspection | 7-15 days |
| Grant disbursement | 30-60 days |
These durations are indicative and can shift depending on DHBVN scheduling and how quickly the portal processes each stage.
Also read:
Let's Begin
Reach out today and we'll steer you through every stage from here.